10-July-2025

Inkster Community Center Parking Lot Overhaul

Completed a full-depth reconstruction of this 25,000 sq ft municipal lot plagued by alligator cracking. Removed 6" of failed base, installed geo-grid stabilization, and applied two-course asphalt with infrared seams to prevent water infiltration. Added ADA-compliant striping with reflective glass beads for night visibility. Project finished 2 days ahead of schedule, allowing the food pantry to reopen without disruption.

10-July-2025

Metro Detroit Warehouse Loading Zone Emergency Repair

Responded within 4 hours to repair 12'x8' sinkhole threatening semi-truck access. Excavated 3' of unstable subbase, compacted recycled concrete aggregate, and poured high-temp asphalt (300°F) for same-day use. Installed steel-reinforced apron edges to withstand 18-wheelers. Solution cost 60% less than full slab replacement.

10-July-2025

Historic Grosse Pointe Residence Driveway Restoration

Preserved 1920s cobblestone borders while completely rebuilding the asphalt center. Hand-excavated failing sections, graded for proper runoff, and installed porous asphalt to complement the home’s drainage system. Custom-matched sealcoat sheen to original aesthetic. Now protects the estate’s value with proper water management.

10-July-2025

Detroit Church Campus Pavement Preservation

Multi-phase project covering 3 acres: sealcoated 400-vehicle main lot using coal-tar emulsion, repaired 120 linear feet of cracks in access drives, and restriped with non-slip epoxy markings. Coordinated with 12 weekend events to minimize closures. Added solar-powered speed bumps for child safety zones.

10-July-2025

Wayne County Industrial Park Pavement MaintenanceAnnual contract servicing 18 loading

Docks and access roads. Performed infrared pothole repairs that bond 5x stronger than cold patches, crack-sealed 1.2 miles of joints, and applied high-solids sealant rated for diesel spills. Night work ensured zero disruption to $2M daily shipping operations.

10-July-2025

Novi Condo Association Pavement Rehabilitation

Resurfaced 45 aging driveways in 30 days using polymer-modified asphalt. Addressed HOA concerns about noise and dust with contained milling, and scheduled sections by building to maintain access. Included educational sessions for residents on maintenance best practices.